The Team

Adam Rana, Project Manager

Jungkyoo Park, Stress Analyst

Ilute Nyambe, Finance Officer
Ravi Parmar, Material Specialist
Arnold Ngang, Chief Designer

Friday 23 April 2010

Conclusion outlining strengths of the contractor

I believe as the project manager of this group that our project has the required strengths to undertake relief work as contracted. The crane has been designed with quality and tough materials but at the same time also keeping the costs of the materials low.
The crane design has been taught out very carefully to make sure it meets the need of the tender. The design conquers all the aspects; it is small enough to fit in a 4x4, measuring at around 3x2 meters.
It can easily be moved around by hand also keeping health and safety regulations in consideration.
Special training is not needed with the use of this crane as it has designed while considering that it can also be used by non-professionals, although it can be provided at an extra cost.
I feel our project has meet the needs of the tender and its robust enough to be successful although there still might be few weakness but are not very significant.
I would like to thank all the team members of their brilliant effort towards this project and hopefully this project will be successful
If you guys would like to input additional strengths please comment below.

1 comment:

  1. I felt one of our project weakness was the overall weight of the crane, which was a great shame! However I still believe it would still be an great asset towards any relif mission.

    ReplyDelete