The Team

Adam Rana, Project Manager

Jungkyoo Park, Stress Analyst

Ilute Nyambe, Finance Officer
Ravi Parmar, Material Specialist
Arnold Ngang, Chief Designer

Thursday, 15 April 2010

Finall Design in CAD Format



This is the base of the crane. There are holes on each side of the base and these are holes where the outriggers will be connected to help keep some stability to the system. There are six otf there. At the top, the intrusion provides room for the crane to rotate so the heavy load can be moved from one position to the other.


from the lecture note

Mechanics


Wednesday, 14 April 2010

young's modulus of steel

Within the limits of elasticity, the ratio of the linear stress to the linear strain is termed the modulus of elasticity or Young's Modulus and may be written Young's Modulus, or E =(Stress/Strain) It is this property that determines how much a bar will sag under its own weight or under a loading when used as a beam within its limit of proportionality. For steel, Young's Modulus is of the order of 205000 N/mm2.
so it is between 190Gpa and 210Gpa

Monday, 5 April 2010

Factors

Factors affecting the crane development

•It cannot be too heavy as it would be too hard to move around.

• The whole assembly would need to be assembled and disassembled without specialist knowledge. It must be do able on the site.

• The cost of each component must also be taken into account as we cannot use very expensive material but at the same time do not compromise the quality.

• Each component was designed with the forces that will be acting on it in mind. The materials we have used are robust enough to hold the load.

• After maintenance - We used alloy metals for the beams because they are easily replaced without any special work. The beams would be under the most stress so therefore we made these replaceable. We have chosen steel as this is a very strong material and less likely to suffer damage in long term.

Friday, 2 April 2010

Final Concept Sketchs



Looking at picture 1.
this was the rough sketch of the final design stipulating what sort of components to use and where to use them.




Picture 2
shows the side of the concept crane design ( upper half). this bit conatains, an eye bolt to help support the steel cords which will be used for pulling heavy objects.



Also below are sketches of the side views for the top beam indicating how the the cord will be passing through.



Picture 3
this indicates the meta bars that will be used when the crane is in operation, to help move the crane around after objects have been lifted.
The base of the crane also shown without the outriggers.

Note:
Sketches produced by the Arnold ( Chief Designer)